Lots happening inside the gates of El Astillero Residential Resort. This week is road building.
1. Packing in select material
600meters in all. Thanks to the Rancho Santana Heavy equipment crew. They are the best at what they do.
2. Saving the trees!
3. All Phase 1 beachfront lots have fully improved roads
4.
Phase One Road work complete
600 Meters & 3 parking lots